STEPS TO BE PREPARED

1.Choose location:

- The location of the tank should be higher, wider than the tank area to ensure convenient travel around the tank.

- Arrange near the management area, daily activities of workers to ensure 24/24 people in tank. Because only 5-10 minutes without timely detection of shrimps will be stressed by the high density.

- Is located near or between ponds to be able to directly discharge shrimp on the tank to commercial ponds without the need to pull the net - avoid losing children.

- The nursing area should have enough space for 2 tanks, as the water needs to be cleaned and ready for treatment when necessary. 


1.jpg (345 KB)

Raise the background and create the desired gradient

 2.jpg (390 KB)

Place the siphon tube, Install the siphon test has reached the check required level yet?

2. Supplies :

- You have to prepare at least 2-3 D114 pipes, 2 suitable locking valves, and 1 co 114 to connect to the siphon hole in the aquarium system provided by Aqua Mina.

- Soil and sand leveling ground to create a slope between the difference of about 30cm, should not be made of cement because the gas can not adjust the slope up and down to suit the bottom of the tank.

- Cables, steel roof framing and plastic roofs to light up the rain.

- 1-2hp air blower, Oxygen tube and blades, do not use venturi,

- 4-6 bow nets (see http://aouongdidong.com/ao-nuoi-tom/cach-lap-dat-he-thong-suc-khi-long-be-uong-noi.html).

- Small backup booths for nursery and other auxiliary equipment.

huongdanlapdat.jpg (1.69 MB)

 

 

STEPS OF INSTALLATION

1. Spreading and connecting siphon pit:

 

3.JPG (61 KB)

Spread the prepared ground

22217724_868239673326001_494246474_o.jpg (306 KB) 

Connect the siphon hole

2. Nets and frames:

- After the canvas, we have located the correct circumference of the bottom, we folded down to avoid scratching, perforation in the process of mesh because the wire mesh is quite sharp. AQUA MINA prepares chicken gut strings to capture sharp edges, avoiding scratches and scratches.

- Next we install the frame, pay attention to erect and connect each standing tree together from 1 to the end, just plug the ground about 5-10cm to ensure the right perimeter. 

              30092017(017).jpg (273 KB)5.jpg (275 KB)

Make mesh & frame only 1-2 workers, do not need any equipme.

3.Loading and finishing:

HDPE treads were made in the factory, folded up to the tank wall about 20cm, then threaded to the rope to locate (note that this rope only has positioning effect, no force bearing).  

22446741_873205309496104_99189789_n.jpg (848 KB) 

Complete the tank installation. 

 

4. Preparation and installation of aeration system:

AQUA MINA offers the most efficient way to apply for the floating tank, as well as for the stream generation, as well as the oxygen supply. Bottom - Design of engineer Chau Cong Son - Vinh Thinh Company.

Boat nose made of iron and thin canvas, fitted in the apricot blossom inside to supply oxygen and stream in the tank. Do not use a fan - Chau Cong Son

5. Treatment waters and stocking:

We treatment waters by  fine chlorine 30ppm. aerated 2-3 days, microorganism and fed into the nursing tank, after a day can be stocked.with fine chlorine 30ppm. aerated 2-3 days, microorganism and fed into the nursing tank, after a day can be stocked.

22561188_874500159366619_1066774404_o.jpg (1.46 MB)

 

Farm CHÍNH MỸ - Mekongtomland breeding after 3 days of installation of floating tank.

Hope that through this article, you grasp and install yourself tank to prepare for a successful crop.

If you have any questions, do not hesitate to call us: Technical Department - for further advice on this matter.

 

TO CONSULT A DESIGNED HIGH QUALITY MOBILE DESIGN SERVICE WITH BEST PRICE

AQUA MINA COMPANY LIMITED

MEKONG CONSTRUCTION

Address: 39 Luong Huu Khanh, Pham Ngu Lao Ward, District 1, HCMC

Hotline: 1800 6071

CUSTOMER CARE

NHAN-VIEN-TU-VAN.jpg (17 KB)

093 699 88 29 (Ms.Dung)

DESIGN CONSULTANCY

Sidebar.jpg (99 KB)

FANPAGE